Tuesday, December 15, 2015
"I've been framed" - The Doors.
We're making progress on the door framing, it'll be laminated the same way as the wall framing.
"Technical" blueprints
Here's the start - had to break to get 1x5" hemlock for the top arch.
We mimic-ed the process from the porthole test design to frame the portholes in the door. We'll use the framing as a guide to make the holes with the router,
Once we get the top arch framed, we'll add the supports for the porthole frame and add some crossbeams. Kreg joinery makes this all a cinch.
Aesthetic Interlude
Now that the main panel framing is done, while we waiting for the glue to dry, started thinking about the doors, how to frame them up with the portholes, and make a lightweight reproductions of the wood part of the exterior like they were in mid-century Chris Craft boats.
Here's how they were framed on deck:
Our interior wall material arrived - I found floor mats made of bamboo in a "teak & holly" stripe pattern. So cool!!!
We also scored some old sails at the Center for Wooden Boat's rummage sale - we think it will be perfect for awning material:
Here's how they were framed on deck:
This thing is 21" wide and weighs a TON.
To save on weight, we are using the safety grate, but not the mahogany. We're using lighter fir instead. Here's the first try. We didn't have wide enough fir, so we just made a test frame:
Here's what it looks like after trimming it into a circle:
Funny thing: we had to test some stains t get the fir test to match the Sapele. When I opened our old can of Dalys Benite (the best wood pre-stain treatment out there), I got a strong sense memory of our fun and pride in our front door project. LOVE that smell.
I found the perfect combo of stains to match, but forgot to take a photo.
We also scored some old sails at the Center for Wooden Boat's rummage sale - we think it will be perfect for awning material:
10 weeks of updates!
The last 10 weeks have been crazy busy with lots of progress!
On our lastepisode blog post, we were stumped by some crazy chip out around the frame when trimming it flush with the pattern. Meaning we had to replace a few boards.

Jim at Rockler said it was the worst chip out he'd ever seen. And Jim at Rockler is our go-to guy for troubleshooting because he's see it all. Good to know even we can stump him.
Solution: more passes starting shallow and using a skinnier spiral blade flush bit.
Tada!!! DONE.
Note: the bottom two pieces of ply aren't lined up, they are just down there to keep them from warping.
But knowing that we had a lot of tenuous router moments ahead very soon, we procrastinated by marking out where our bodies & beds went in the camper to help plan for framing supports for interior cabinetry.
Next up, we had to use the pattern to cut back the framing. (More on this later)
Jason's a sexy beast when he's routing ...

Rawr ...
Below is the cutoff that will serve as supports and framing between the trailer ceiling and roof. This was done in a unique way - essentially you use a router bit for the first few passes, then chuck a rotozip bit into the router to get you all the way through the framing.
The kerf gives you a perfect 1/8" gap for the ceiling - which will be painted luan.

Here's the exterior of the first panel after glue-up, we'll trim the door frame flush with a router, but it make for a good wall hanging spot for the time being. (or for the "time beans," as I like to say).
We are protecting it with brown craft paper, and I couldn't resist doing the smiley face.

Now onto the doors!
On our last

Jim at Rockler said it was the worst chip out he'd ever seen. And Jim at Rockler is our go-to guy for troubleshooting because he's see it all. Good to know even we can stump him.
Solution: more passes starting shallow and using a skinnier spiral blade flush bit.
Tada!!! DONE.
Note: the bottom two pieces of ply aren't lined up, they are just down there to keep them from warping.
But knowing that we had a lot of tenuous router moments ahead very soon, we procrastinated by marking out where our bodies & beds went in the camper to help plan for framing supports for interior cabinetry.
So here's what the framing of Quind looks like on the ply. We lined it up to trace around it to aid with gluing later.
Next up, we had to use the pattern to cut back the framing. (More on this later)
Jason's a sexy beast when he's routing ...

Below is the cutoff that will serve as supports and framing between the trailer ceiling and roof. This was done in a unique way - essentially you use a router bit for the first few passes, then chuck a rotozip bit into the router to get you all the way through the framing.
The kerf gives you a perfect 1/8" gap for the ceiling - which will be painted luan.
Since we're using 1 x stock for the framing, we wanted to reinforce the door frame/lock area for security, so we modified some Simpson galvanized steel plates to go around the door frame where the strike and bolt are.

We have each mirrored side labeled as Driver and Passenger, so I've taken the opportunity to "Strike Driver" and (jokingly) smacked Jason a few times - hehe!!!
There was some splitting in the wood at a couple of joints we decided to repair, and went back and put glue in all the screw holes.
Here you can see the framing, ready for glue-up/lamination to the exterior ply walls.
We needed to come up with a way to add a LOT of weight to the parts of the framing we couldn't reach with clamps. The Steve Fredericks manual says to fill kitty litter bottles with sand, but had neither. Next best thing: fill gallon water bottles with concrete! Yep, we even mixed it up so they are solid 'crete. It feels like each weighs about 20-25 lbs.
Here's the first panel getting laminated. We used a marine epoxy and protected areas with waxed paper.
Here's the exterior of the first panel after glue-up, we'll trim the door frame flush with a router, but it make for a good wall hanging spot for the time being. (or for the "time beans," as I like to say).
We are protecting it with brown craft paper, and I couldn't resist doing the smiley face.
Also, in the interest of fairness, I ripped my favorite junk jeans, so since I posted Jason's, it's only fair to post my mishap:

Here's the second side getting laminated to the framing, same as the first:
Monday, October 5, 2015
Straight thru the Uprights!
This weekend we got more done than we did in the last six months. The uprights in the framing are installed!
The hardest part was getting the angle right attaching the topside around the frame. Using Kreg joinery, it pulls everything tight, which is great, but requires more precision.
We've started rounding out the edge to the actual profile using a flush trim bit, but we had to pause when we started getting chipout, and our template has a few voids that line up perfectly with the bearing. Now we're researching ways to avoid it before going further.